Covering a total area of approximately 168 mu (about 11.2 hectares), the project will have a stock of 2,000 purebred breeding pigs after commissioning, and can supply 20,000 breeding sows annually to local and other regions. The installed equipment includes: pen system, environmental control system, feeding line system, lighting system, water line system, high-pressure cleaning system, air filtration system, centralized feeding system, and centralized alarm system.
